A woven stainless mesh element built to a drawing in the form the housing needs — cylinder, disc or framed panel. About 70% of what we ship replaces an OEM element; the rest is designed from operating conditions. Woven wire mesh covers 5–200 μm, and inside that range the exact opening follows the weave the duty needs; the figure is confirmed on every batch. Service temperature holds to 600 °C.
When the geometry does not match anything in a catalogue, this is the element: woven stainless mesh built to a drawing as a cylinder, a disc or a framed panel, with the frame, edge finish and connection welded in house. There is no fixed form, and the rating runs across the 5–200 μm range woven wire mesh covers. The exact opening follows the weave the duty needs, and the form follows the housing, the holder or the OEM element being replaced.
The work starts either from a drawing or a part number — about 70% of what we ship is a replacement — or from operating conditions, which is the remaining 30%. For a replacement we match dimensions, weave, frame and connection detail against the OEM element before anything is quoted. For a new duty we take the seven inputs: temperature and peaks, medium and corrosive constituents, working pressure and differential, contaminant and particle size distribution, required rating with any bubble point or air permeability target, flow and elements per housing, and the geometry.
Woven mesh is the right medium for the coarser end of the work, and for the protective and support layers inside a finer element. Where the duty is fine — a contaminant measured in a few microns that has to be held in depth — a sintered fiber felt or multilayer sintered mesh element serves better. Those two media are bought in to specification, while everything else, including the cloth, the forming and the welding, is done in our own plant under ISO 9001.
Custom work is confirmed before it is priced: we confirm manufacturability, issue a drawing marked with tolerances and connection details for your approval, and quote from that drawing. Drawing review takes 3–5 working days, samples ship in 20–30 days and production runs take 30–60 days. The minimum order is a few pieces to a few dozen elements.